Data-Driven Analysis to Define Your Optimal ASRS Blueprint.

Core Value

Perfect Plan and Suitable Solution

Plan: The Strategic Blueprint That Transforms Vision into Executable Reality

Every great automated warehouse begins not with steel, but with a question. Not “Which crane should we buy?” or “How many pallet positions do we need?”—but a more fundamental inquiry: “What business problem are we trying to solve?”

The answer to that question is the seed from which every successful automation project grows. It defines the objectives, constrains the options, and provides the criteria against which every subsequent decision will be measured. Yet this seed, however powerful, is not enough. It requires cultivation—translation from strategic intent into operational requirements, from high-level goals into detailed specifications, from vision into a comprehensive, actionable blueprint.

This translation is the domain of planning. And at KINGSHELVING, planning is not a preliminary formality—it is a rigorous, data-driven discipline that de‑risks your investment, aligns stakeholders, and establishes the foundation for every subsequent phase of design, engineering, and implementation.

  • Core Positioning: The strategic blueprint that transforms business objectives into an executable automation roadmap; the critical discipline that de‑risks investment and aligns vision with reality.

  • Strategic Value: Answers the fundamental question “What problem are we solving?” before any equipment is specified; ensures every subsequent decision is measured against clear, agreed objectives.

  • KINGSHELVING Philosophy: Planning is not a preliminary formality—it is a rigorous, data‑driven discipline that transforms vision into a comprehensive, actionable blueprint.


I. The Planning Imperative: Why Thorough Planning Defines Project Success

The Cost of Insufficient Planning
Inadequate planning is the single largest contributor to automation project failure. When planning is rushed or superficial, the consequences cascade through every subsequent phase:

  • Scope creep: Undefined objectives allow requirements to expand during execution, inflating costs and delaying completion

  • Technology mismatch: Equipment selected without thorough requirement analysis proves ill‑suited to actual operational profiles

  • Integration failures: Interfaces between systems are discovered late, requiring costly rework

  • Capacity shortfalls: Throughput assumptions prove optimistic, leaving facilities unable to meet demand

  • Budget overruns: Unforeseen requirements and change orders consume contingency reserves and erode ROI

The ROI of Rigorous Planning
Conversely, thorough planning delivers measurable returns:

  • Reduced project risk: Clear objectives and validated requirements eliminate uncertainty

  • Faster implementation: Well‑defined scope and specifications accelerate procurement, engineering, and installation

  • Lower total cost: Optimal technology selection and integration design minimize capital and operating expenses

  • Predictable outcomes: Performance, capacity, and budget are established with confidence before commitments are made

  • Stakeholder alignment: All parties share a common understanding of objectives, expectations, and success criteria

The Planning Timeline
Effective planning is not a single event—it is a phased process that unfolds before any equipment is ordered or steel is fabricated:

 
 
PhasePurposeKey ActivitiesDeliverables
DiscoveryUnderstand business drivers, operational context, and constraintsStakeholder interviews, site visits, data collectionProject charter, initial requirements document
AnalysisQuantify current operations, model future scenariosSKU profiling, order analysis, throughput modelingBaseline metrics, demand forecasts
Concept DevelopmentGenerate and evaluate alternative solutionsTechnology assessment, layout options, cost modelingConcept alternatives with pros/cons
Feasibility ValidationTest preferred concepts against real-world constraintsSimulation, vendor consultations, site surveysFeasibility report, risk assessment
Requirements DefinitionSpecify detailed functional and technical requirementsRequirements workshops, specification writingFunctional specification, RFP documents
  • Inadequate planning is the leading cause of project failure—scope creep, technology mismatch, integration failures, capacity shortfalls, budget overruns.

  • Rigorous planning delivers measurable ROI: reduced risk, faster implementation, lower total cost, predictable outcomes, stakeholder alignment.

  • Planning is a phased process: Discovery → Analysis → Concept Development → Feasibility Validation → Requirements Definition.


II. Discovery: Understanding Your Business and Operations

Stakeholder Alignment
Planning begins with people. KINGSHELVING’s discovery phase engages all stakeholders whose perspectives shape project success:

  • Executive sponsors: Strategic objectives, investment criteria, success metrics

  • Operations management: Current challenges, improvement priorities, operational constraints

  • IT leadership: System integration requirements, technology standards, security policies

  • Finance: Budget parameters, approval thresholds, ROI expectations

  • End users: Daily workflows, pain points, ergonomic considerations

Through structured interviews and facilitated workshops, we build a shared understanding of what success looks like—and what obstacles must be overcome to achieve it.

Operational Context
Every warehouse operates within a unique context that shapes its automation requirements:

  • Facility characteristics: Building dimensions, column spacing, ceiling height, floor capacity, dock configuration, expansion potential

  • Material characteristics: SKU count, dimensions, weights, packaging, shelf life, special handling requirements (cold chain, hazardous, ESD)

  • Flow characteristics: Receiving patterns, storage profiles, order profiles, throughput requirements, seasonality

  • Labor context: Workforce availability, skill levels, shift patterns, labor costs

  • Regulatory environment: Industry regulations, safety standards, compliance requirements

Data Collection
Planning is only as good as the data on which it is based. KINGSHELVING’s discovery phase collects comprehensive operational data:

  • Historical order data: 12–24 months of order history, analyzed for patterns, trends, and variability

  • SKU master data: Dimensions, weights, velocities, storage requirements

  • Inventory data: Current storage utilization, turnover rates, ABC distribution

  • Process documentation: Standard operating procedures, workflow diagrams, labor standards

  • Facility documentation: CAD drawings, structural plans, utility layouts

  • Stakeholder alignment ensures all perspectives are understood and success criteria are shared.

  • Operational context encompasses facility, material, flow, labor, and regulatory dimensions.

  • Data collection provides the factual foundation for all subsequent analysis—order history, SKU master, inventory, processes, facility.


III. Analysis: Quantifying Current Operations and Future Requirements

SKU Profiling
Not all SKUs are equal. Effective automation design requires understanding the distribution of SKU characteristics, not just averages:

  • Velocity analysis: ABC classification based on movement frequency—identifying fast‑movers, medium‑movers, and slow‑movers

  • Dimension analysis: Distribution of case and pallet sizes—identifying standard vs. exception SKUs

  • Weight analysis: Load distribution—ensuring equipment capacity matches actual requirements

  • Storage requirement analysis: Special storage needs (cold chain, hazardous, ESD)—segregation requirements

Order Profiling
Order characteristics determine picking and fulfillment strategies:

  • Order size distribution: Lines per order, units per line—determining picking methodology (single, batch, zone)

  • Order composition: Mix of SKU velocities within orders—influencing slotting and replenishment

  • Temporal patterns: Hourly, daily, seasonal order profiles—defining peak capacity requirements

  • Cut‑off times: Order release schedules—determining wave planning and throughput timing

Throughput Modeling
With SKU and order profiles understood, KINGSHELVING models current and future throughput requirements:

  • Inbound throughput: Receiving volume, putaway transactions—defining receiving and putaway capacity

  • Storage throughput: Pallet-in/pallet-out rates—determining ASRS transaction requirements

  • Picking throughput: Order lines per hour—sizing picking zones and workstations

  • Outbound throughput: Packing and shipping volumes—defining packing capacity and dock requirements

  • Peak vs. average: Identifying design basis—peak period (seasonal, promotional) defines required capacity

Gap Analysis
Comparing current capabilities with future requirements identifies the gaps that automation must fill:

  • Capacity gaps: Current throughput vs. projected demand

  • Performance gaps: Current accuracy, speed, cost vs. target metrics

  • Space gaps: Current storage density vs. required capacity

  • Labor gaps: Current workforce vs. projected requirements

  • Technology gaps: Current systems vs. required capabilities

  • SKU profiling reveals the true distribution of item characteristics—velocity, dimension, weight, special requirements.

  • Order profiling defines picking and fulfillment strategies—order size, composition, temporal patterns, cut‑off times.

  • Throughput modeling quantifies current and future transaction volumes across all warehouse processes.

  • Gap analysis identifies the specific deficiencies that automation must address—capacity, performance, space, labor, technology.


IV. Concept Development: Generating and Evaluating Alternatives

Technology Assessment
With requirements quantified, KINGSHELVING evaluates the spectrum of applicable automation technologies:

  • Storage technologies: Selective rack, double‑deep, push‑back, drive‑in, pallet shuttle, ASRS stacker crane, miniload, VLM, carousel

  • Transport technologies: Conveyor (roller, belt, chain), AGV, AMR, RGV, lift

  • Picking technologies: Pick‑to‑light, put‑to‑light, voice, vision, goods‑to‑person, robotic picking

  • Sortation technologies: Cross‑belt, tilt‑tray, sliding shoe, pusher, pop‑up

  • Software technologies: WMS, WCS, WES, labor management, analytics

Each technology is assessed against the project’s specific requirements, not generic “best practices.”

Layout Development
Technology concepts are translated into physical layouts:

  • Space allocation: Receiving, storage, picking, packing, shipping, support areas sized to throughput requirements

  • Flow design: Material paths optimized for distance, congestion, and process sequence

  • Equipment placement: Cranes positioned, conveyor networks routed, workstations located for ergonomic efficiency

  • Integration points: Handoffs between systems designed for smooth, deterministic material flow

Multiple layout options are developed, each with distinct trade‑offs in cost, throughput, flexibility, and expandability.

Cost Modeling
Each concept is translated into a detailed cost estimate:

  • Capital equipment costs: Racking, cranes, shuttles, conveyors, sorters, workstations, software licenses

  • Installation costs: Site preparation, equipment installation, integration, commissioning

  • Operating costs: Energy consumption, maintenance, labor, supplies

  • Lifecycle costs: Total cost of ownership over 10–15 years, including replacement and upgrade costs

Benefit Quantification
Concurrent with cost modeling, KINGSHELVING quantifies expected benefits:

  • Productivity improvement: Labor hours saved, throughput increased

  • Space efficiency: Storage density gain, footprint reduction

  • Accuracy improvement: Error reduction, returns reduction

  • Service level improvement: Order cycle time reduction, cut‑off compliance

  • Risk reduction: Safety improvement, contingency capacity

  • Technology assessment matches applicable automation types to quantified requirements.

  • Layout development translates concepts into physical designs with optimized flow and integration.

  • Cost modeling provides detailed capital, installation, operating, and lifecycle cost estimates.

  • Benefit quantification projects productivity, space, accuracy, service, and risk improvements.


V. Feasibility Validation: Testing Concepts Against Reality

Simulation Modeling
Before committing to a concept, KINGSHELVING validates its performance through discrete‑event simulation:

  • Throughput validation: Model runs confirm that proposed systems can achieve required transaction rates under realistic operating conditions

  • Bottleneck identification: Simulation reveals hidden constraints—merge congestion, lift capacity, workstation starvation

  • Sensitivity analysis: Models test system performance under varying conditions—order profiles, equipment availability, seasonality

  • What‑if scenarios: Alternative configurations are compared to identify the most robust solution

Simulation provides empirical evidence, not theoretical estimates, of system performance.

Site Surveys
Conceptual layouts must be validated against physical reality:

  • Structural surveys: Column locations, floor flatness, ceiling height, load capacity verified

  • Utility surveys: Power distribution, data network, lighting, HVAC capacity confirmed

  • Access surveys: Dock dimensions, truck maneuvering, staging areas assessed

  • Environmental surveys: Temperature ranges, humidity, dust, vibration measured

Vendor Consultations
For technologies where multiple vendors are viable, KINGSHELVING engages with potential suppliers:

  • Capability confirmation: Vendor equipment specifications matched to requirements

  • Performance validation: Cycle times, accuracy, reliability data reviewed

  • Integration assessment: Compatibility with other systems and control architecture confirmed

  • Commercial alignment: Pricing models, lead times, warranty terms established

Risk Assessment
Every project carries risk. KINGSHELVING’s feasibility phase systematically identifies and mitigates potential risks:

  • Technical risk: Unproven technology, integration complexity, performance uncertainty

  • Schedule risk: Long lead items, installation complexity, critical path dependencies

  • Cost risk:

  • Operational risk: Disruption during implementation, transition challenges

  • Organizational risk: Change readiness, training requirements, adoption barriers

For each identified risk, mitigation strategies are developed—design alternatives, contingency plans, staged implementation, enhanced testing.

  • Simulation modeling provides empirical validation of throughput, identifies bottlenecks, and tests sensitivity.

  • Site surveys verify physical conditions against conceptual assumptions—structure, utilities, access, environment.

  • Vendor consultations confirm equipment capabilities, performance, integration, and commercial terms.

  • Risk assessment systematically identifies and mitigates technical, schedule, cost, operational, and organizational risks.


VI. Requirements Definition: The Blueprint for Execution

Functional Specification
The culmination of planning is a comprehensive functional specification that guides all subsequent phases:

  • Operational requirements: Throughput volumes, service levels, accuracy targets, operating hours

  • Process definitions: Detailed workflows for receiving, putaway, storage, picking, packing, shipping

  • Equipment specifications: Type, quantity, performance parameters, configuration of all automation systems

  • Software requirements: WMS, WCS, WES functionality, integration interfaces, user interfaces

  • Facility requirements: Structural modifications, power distribution, network infrastructure, environmental controls

  • Performance criteria: Acceptance test definitions, success metrics, service level agreements

RFP Documentation
For projects where multiple suppliers will bid, KINGSHELVING prepares comprehensive request‑for‑proposal documentation:

  • Scope definition: Clear, unambiguous description of what is to be delivered

  • Technical specifications: Detailed requirements for all systems and components

  • Commercial terms: Pricing structure, payment milestones, warranty conditions

  • Evaluation criteria: Transparent basis for proposal comparison and selection

  • Submission requirements: Format, content, and deadline for proposals

Stakeholder Approval
Before proceeding to procurement, the plan must be reviewed and approved by all stakeholders:

  • Executive approval: Strategic alignment, investment justification, ROI validation

  • Operational approval: Workability, user acceptance, transition readiness

  • Financial approval: Budget confirmation, funding availability

  • Regulatory approval: Compliance with applicable codes, standards, and regulations

The Planning Deliverable
The complete planning deliverable is a comprehensive document (or set of documents) that serves as the single source of truth for the project:

  • Executive summary: High‑level overview for decision‑makers

  • Requirements documentation: Detailed functional and technical specifications

  • Concept design: Layout drawings, flow diagrams, equipment lists

  • Financial analysis: Cost estimates, benefit projections, ROI calculations

  • Risk assessment: Identified risks and mitigation strategies

  • Implementation roadmap: Phased plan, timeline, resource requirements

  • Functional specification translates planning outputs into detailed requirements for all systems and processes.

  • RFP documentation enables competitive bidding when multiple suppliers will be engaged.

  • Stakeholder approval ensures alignment and commitment before proceeding to procurement.

  • The planning deliverable serves as the single source of truth for the entire project lifecycle.


VII. The KINGSHELVING Planning Advantage

Data‑Driven, Not Opinion‑Based
KINGSHELVING’s planning discipline is rooted in data, not intuition. Every recommendation is supported by quantitative analysis—SKU profiling, order analysis, throughput modeling, simulation results. We do not ask you to trust our judgment; we ask you to review our analysis.

Technology‑Neutral, Not Vendor‑Locked
Unlike integrators who represent specific equipment lines, KINGSHELVING’s planning is technology‑neutral. We evaluate the full spectrum of applicable technologies and recommend the optimal solution for your requirements—not the solution that maximizes our equipment sales. This objectivity ensures that your plan is based on what is best for your operation, not what is best for our inventory.

Collaborative, Not Prescriptive
KINGSHELVING does not plan in isolation. Our process engages your stakeholders throughout—validating assumptions, refining requirements, building consensus. The resulting plan reflects not only our expertise but your operational knowledge. It is a plan you own, not a plan we impose.

Scalable, Not One‑Size‑Fits‑All
KINGSHELVING’s planning methodology scales to projects of any size and complexity. Whether you are automating a single storage zone or designing a greenfield distribution center, our disciplined approach ensures thoroughness without over‑engineering. The level of detail is calibrated to your project’s risk profile and investment magnitude.

Future‑Proofed, Not Static
A good plan anticipates the future. KINGSHELVING’s planning explicitly considers growth scenarios, technology evolution, and operational flexibility. Your plan includes not only the immediate implementation but a roadmap for future expansion and adaptation—protecting your investment against obsolescence.


Your Vision. Our Plan. Success Engineered.

The automated warehouse that performs flawlessly on go‑live day did not happen by accident. It was planned—meticulously, rigorously, collaboratively—long before the first order was placed or the first beam was fabricated. Every successful project is, at its core, the execution of a sound plan.

KINGSHELVING’s planning discipline delivers that sound plan. It transforms your business objectives into a comprehensive blueprint, validated by data, tested by simulation, and aligned with your stakeholders. It de‑risks your investment, accelerates your implementation, and ensures that every dollar you spend on automation delivers the return you expect.

When you engage KINGSHELVING for planning, you are not merely purchasing a study. You are investing in certainty—the confidence that your automation project will succeed because its foundation was built on rigorous analysis, collaborative design, and proven methodology.

Your vision. Our plan. Success, engineered from the start.